SHELTER RESTORATION - SALAMIS NAVAL BASE
Project Information
Title
Restoration works of the K-15 pier, Salamis Naval Base
Design Scope
Geotechnical site Investigation and Design
Period of Execution
Project Description
In the survey area of the Salamis Naval Station, two (2) sections are distinguished, the land and the sea. In the land area there is a metal hangar (HANGAR), while in the marine area there is a convoy with submarine towing facilities (SHIPLIFT), east of which is the K-15 berth, while the other side is an anchorage. Geotechnical site Investigation and Design was carried out for the restoration of the shelf and the works took place over a length of approximately 197 metres.